The building, which was completed in October, 2006, provides a case study where both timing and flexibility were critical to satisfying the needs of CEPDM for their new and expanded Fresno Operations. What started out as a simple request for a proposal from Corporate Express to purchase land in North Pointe eventually culminated in December 2005 (through multiple iterations) into a build-to-suit, long term lease arrangement, including options to extend the lease term, expand the lease premises, and purchase the lease premises at the end of the lease term.
Regional manufacturing, sales and distribution headquarters
10 months from groundbreaking to occupancy
Plans to expand by 50,000 contiguous square feet
Site designed and configured to suit CEDPM’s current and future needs
Attractive architecture
Construction Date: | 2006 |
Building Size: | |
Suite Sizes: | |
Lease Rate: | |
Utilities: | |
Clear Height: | |
Truck Doors: | |
Sprinkler System: | |
Concrete Slab: | |
Wall Construction: | |
Roof Construction: | |
Roofing: | |
Skylights: | |
Dock Construction: | |
Parking Stalls: | |
Column Spacing: | |
Electrical: |
Cities | |
---|---|
Oakland | 179 miles |
San Francisco | 190 miles |
Sacramento | 173 miles |
Los Angeles | 217 miles |
Las Vegas | 392 miles |
Phoenix | 588 miles |
Ports | |
---|---|
Port of Oakland | 179 miles |
Port of LA and Long Beach | 238 miles |